T2 Dublin Airport
The Dublin Airport Authority required a second terminal to cater for the ever growing numbers of passengers through the facility.
With the introduction of the new terminal requiring a high speed fibre optic and copper backbone network, the Metropolitan Area Network also needed to be upgraded throughout the campus.
The DAA Terminal 2 and MAN upgrade projects were completed together, with Commscope and Temple working in tangent with the System Integrators to ensure both projects were completed to a very high standard.